BASELOAD CAPITAL SWEDEN AB (PUBL) TODAY RELEASES THE RESULTS FOR THE PERIOD 1 JANUARY – 31 MARCH 2021

May 26, 2021

During the first quarter of 2021, Baseload closed a capital round of USD 25m with Chevron Technology Ventures (“Chevron”) as a new strategic investor.

  • The result for the first quarter was SEK -31.0 million (SEK -8.3 million for the same period in 2020).​​​​​​
  • In Japan, work continues on the third project for Baseload Power Japan. Called Sansui, it is a small project where an existing onsen-well is used to run two Climeon modules. The project is strategically important to be able to expand with larger projects in the vicinity.
  • In Taiwan, drilling is back in full swing at the Westlake project with a depth of 900 meters and a target of 1200 meters. According to the new schedule, drilling should be completed by the end of May or the beginning of June.
  • In Iceland, Varmaorka commissioned phase 2 of the Fludir project, and started up an additional 600 kW of power, which gives Fludir 1 & 2 a total capacity of 1200 kW. The work for phase three has also begun, with an evaluation of whether we can build an additional 500 to 1500 kW on the site.
  • In the US, Baseload has signed an LOI together with Chevron’s Technology Center to build a pilot project on an existing well.

The information was submitted for publication at 07:30 CET on 26 May 2021.

For more information, please contact:
Alexander Helling CEO of Baseload Capital
alexander.helling@baseloadcap.com

Downloads:

Interim report_Q1_2021

Share:

RELATED POSTS

Baseload Capital recognized by energy leader Baker Hughes

Energy technology giant Baker Hughes praised the role of Baseload Capital in bringing together leaders within geothermal and demonstrating greater industry unity. 

Coffee with Baseload – Episode #4

The question that seek for an answer on this episode of Coffee with Baseload comes from Neil F. and is about skills transfer and skills shortage:

Don't blame the individual, put pressure on institutions - Jonathan Maxwell, CEO SDCL

If everyone depends on energy, why do we waste most of it? To be precise, why do we waste up to 50 % of original energy before it even gets to the demand side?

The Geothermal Decade! Virtual seminar #5 The earth has power. Let’s switch it on.

Andrea Blair takes on the view of the global industry, the challenges it presents, and the hurdles we need to overcome.
1 2 3 17
menu linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram